Installing our urban benches is a straightforward process we've refined to ensure durability, safety, and aesthetic appeal. Here are the key steps involved:
First, we conduct a thorough Site Assessment and Preparation. Our team visits the location to verify the planned installation site against your project drawings. We check for underground utilities, assess soil conditions, and ensure the area is level and clear of debris. Proper preparation is crucial for a long-lasting installation.
Next, we proceed with Foundation Work. For permanent installations, we typically excavate holes for concrete footings. We set and level the anchor sockets or base plates into the wet concrete, ensuring precise alignment and embedment depth as per engineering specifications. This stage requires curing time, usually 24-48 hours, depending on the climate.
Once the foundation is ready, we move to Bench Assembly and Placement. For pre-assembled units, we carefully lift and position the bench onto the anchored base plates. For modular systems, we assemble the components on-site—attaching the seat slats, backrests, and armrests to the pre-installed support frames. All connections are tightened to the manufacturer's specified torque.
The final phase is Final Fixing and Inspection. We secure the bench structure to its foundation using the provided bolts or locking mechanisms. Our team then conducts a comprehensive inspection: checking for stability, ensuring all fasteners are tight, verifying there are no sharp edges, and confirming the installation meets all local safety and accessibility codes. We clean the bench and the surrounding area before handing over the completed project.
By following these meticulous steps, we guarantee a secure, compliant, and visually pleasing installation that will serve your community for years to come.