That's an excellent question, and one we hear often. The turnaround time for a custom order of ten park benches isn't a one-size-fits-all answer, as it depends on several key factors. Typically, for a standard design with readily available materials, you could expect a production timeline of approximately 4 to 6 weeks from finalized design and deposit to completion. However, this timeframe can vary.
The complexity of your design is a major factor. A simple, straightforward bench will move much faster than one with intricate carvings, custom metalwork, or special ergonomic features. Material selection also plays a role. While standard hardwoods may be in stock, exotic or specially treated lumber might require additional sourcing time. Furthermore, our current production schedule at the time of order placement will influence the start date.
The process usually follows these stages: initial consultation and design finalization (1-2 weeks), material procurement (1-2 weeks), fabrication and assembly (2-3 weeks), and finally finishing (sanding, staining, sealing) and quality checks (1 week). We always provide a detailed project timeline after reviewing your specific requirements.
For a more precise estimate for your ten benches, please reach out with your design ideas or specifications. We're committed to delivering exceptional quality and will work with you to establish a realistic and reliable schedule for your project.